Quantcast Section XXXIII. ASSEMBLY OF POWER TRAIN FROM SUBASSEMBLIES CONT. - TM-9-2520-234-35_221

Custom Search
 
  
 
PAR  228,   STEPS  1  5 - 18 A S S E M B LY C H A P   5,   SEC  X X X I II Figure   342   (Step   15) Install   lockup   clutch   plate   (A).   Install   lockup clutch   back   plate   (B).   Aline   bolt   holes. Figure   343   (Step   16) Install   torque   converter   turbine   assembly   (A), meshing   the   splines   of   the   turbine   hub   with those   of   lockup   clutch   plate   (B). Figure   344   (Step   17) I n s t a l l    s t a t o r    a s s e m b l y    ( A ) .    I n s t a l l    t o r q u e c o n v e r t e r     p u m p     a s s e m b l y     ( B ) .     I n s t a l l     t w o 5 / 1 6 - 2 4    n u t s ,    1 8 0 °    a p a r t ,    t o    h o l d    c o n v e r t er a s s e m b l y      t o g e t h e r. T u r n    a s s e m b l y    o v e r    o n a s s e m b l y    t a b l e. Figure   345   (Step   18) Install   the   remaining   twenty-two   5/16-24   nuts ( A ) .    U s i n g    a    1 / 2 - i n c h    w r e n c h ,    t o r q u e    a l l    of the nuts, alternately and evenly, to 19-23 p o u n d - f e e t. 1 8 9


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +