Quantcast INSTALLATION (Continued) - TM-9-2815-220-240532

Custom Search
 
  
 
TM 9-2815-220-24
GENERATOR WIRING HARNESS REPLACEMENT (2CA) (PN 11655451)
0063 00
INSTALLATION (Continued)
2. Install generator wiring harness (continued).
h. Ensure that electrical lead (ground) terminals (6) are clean.
i. Secure the right lower ground lead with a flat washer (8) on each side of the lead using
support mounting screw (9).
j. Remove lower right generator support screw (9) and flat washers (8). Discard screw.
k. Secure right upper lead with a flat washer (8) on each side of the lead using a new support
mounting screw (3/8-24 x 1-3/4 long) (7).
m. Install assembled ground strap (s) and bus bar on generator terminal and secure using
original self-locking nut (4) with flat washer (5).
4, 5
6
8
7
8
9
WP 0063 00-16

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +