Quantcast INSTALLATION (Continued) - TM-9-2815-220-240756

Custom Search
 
  
 
TM 9-2815-220-24
SMOKE GENERATION SYSTEM REPLACEMENT
0094 00
INSTALLATION (Continued)
3. Install smoke generation solenoids (20) and bracket (25) assembly.
a. Install solenoid bracket (25) with retaining screws (24).
b. Install fuel line (21) at tee fitting (23).
c. Install fuel line (21) to outlet elbow fitting (22).
4. Install fuel line (13) to smoke solenoids (20).
a. Install fuel line (13) onto elbow fitting (19).
b. Secure fuel line (13) with loop clamp (18) and screw (17).
23
19
20
17, 18
25
13
22
24
21
WP 0094 00-12

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +