Quantcast INSTALLATION (Continued) - TM-9-2815-220-240757

Custom Search
 
  
 
TM 9-2815-220-24
SMOKE GENERATION SYSTEM REPLACEMENT
0094 00
INSTALLATION (Continued)
5. Install bulkhead fuel line elbow (12).
a. Position elbow fitting (12), into bulkhead.
b. Install nut (14), new lock washer (15) (item 87, WP 0175), and flat washer (16) onto
elbow fitting (12).
c. Install fuel line (13) onto elbow fitting (12).
d. Install fuel line (6) onto elbow fitting (12).
6
12
16
15
14
13
WP 0094 00-13

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +