Custom Search
 
  
 
TM   5-2815-241-34&P TURBOCHARGER  CROSSOVER  TUBE  INSTALLATION INITIAL  SETUP Tools Materials/Parts Extension,   6-inch,   1/2-inch   drive Handle,   ratchet,   1/2-inch   drive Pry bar, lb-inch Socket,   9/16-inch,   1/2-inch   drive Wrench,   open-end,   7/16-inch Gasket Lockwasher  (four  required) ACTION LOCATION ITEM REMARKS NOTE Turbocharger crossover tube is removed from engine before removing engine from vehicle  to  allow  installation  of  front  lifting  eye.  It  is  shipped  with  engine  to  allow  testing and  adjustments  to  be  accomplished  on  engine  test  stand. 1. Top  of  engine  (1) 2.  Turbocharger air outlet   (3) 3. Top of intake manifold   (7) 4. 5. 6. Hose (4) 7. Lifting  eye  (2) Hose  (4),  hose clamp  (5),  and  hose clamp  (6) New  gasket  (8) Turbocharger   cross- Position on intake manifold (7) and Into over tube (9) hose (4). Four  screws  (10), four  new  lockwashers (11),  and  four  flat washers  (12) Hose  clamp  (5) Hose  clamp  (6) Using 18-inch pry bar, unscrew and take out. a. Push  on  hose  (4). b. Put  hose  clamps  (5)  and  (6)  over hose. Aline  holes  in  gasket  and  intake  manifold and  put  on. Using  1/2-inch  drive,  9/16-inch  socket,  6- inch  extension,  and  ratchet  handle,  screw In and tighten. Position  on  lower  portion  of  hose  and  using 7/16-inch   open-end   wrench,   tighten. Position on upper portion of hose and using 7/16-inch   open-end   wrench,   tighten. 2-138


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business