Custom Search
 
  
 
TM   5-2815-241-34&P PISTON  AND  CONNECTING  ROD  -  CONTINUED ACTION LOCATION ITEM REMARKS CLEANING/INSPECTION  -  CONTINUED 10. Connecting  rod  (1), bearing  cap  (2), and  two  bolts  (3) Using  magnetic  inspection  procedure, inspect  for  cracks. Pay particular attention to cracks in critical  areas  (4). If  cracks  exist,  discard  connecting rod. 11.  Connecting  rod  (1) Bearing  cap  (2), two  nuts  (5),  and two  new  washers  (6) a. Put bearing cap on connecting rod and install  nuts  and  new  washers. b.  Using  1/2-inch  drive  15/16-inch socket and 0 to 150 ft lb (0 to 210 N•m) torque  wrench,  tighten  nuts  as  shown  in table  below. CONNECTING ROD NUTTIGHTENING SEQUENCE TORQUE VALVE TIGHTENING SEQUENCE FT LB (N•m) Step  1.  Tighten  to 70  -    75 (95  -    102) Step  2.  Advance  to 140  -    150 (190  -    203) Step  3.  Loosen  to 0 (0) Step  4.  Tighten  to 25  -   30 (34  -   41) Step  5.  Advance  to 70  -    75 (95  -    102) Step  6.  Advance  to 140  -    150 (190  -    203) 12. Crankpin  bore  (7) a. Using  dial  bore  gage  (8),  measure inside diameter at points A - A and B - B up to 30° either side of parting line C, and  record  readings. If  crankpin  bore  diameter  Is  not between  3.2722  to  3.2736  inch (83.114  to  83.149  mm),  tag  connec- ting  rod  for  crankpin  bore  resizing. 2-224


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business