TM 5-2815-241-34&P
FUEL PUMP - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
SHUTDOWN VALVE REPAIR
NOTE
For shutdown valve removal procedures, see step 5, page 2-292.
42. Shutdown valve
housing (1)
Four machine screws
Using 1/4-inch flat-tip screwdriver, un-
(2) and four lock-
screw and remove.
washers (3)
Discard lockwashers.
43.
44.
45.
46.
47.
48.
Coil assembly (4)
Remove.
Access cover plate
(5), spring washer
(6), preformed pack-
ing (7), disk
valve (8)
Remove.
Discard packing.
Override knob (9)
Pull off.
Shaft (10), pre-
formed packing (11)
and O-ring (12)
Using 1/4-inch flat-tip screwdriver, un-
screw and remove shaft and preformed
packing from coil end.
Discard shaft, preformed packing
and O-ring.
Pipe plug (13)
Using 7/16-inch open-end wrench, un-
screw and remove.
CAUTION
Do not wet coil assembly with solvents or cleaners. Solvents or cleaners will cause
damage to coil.
NOTE
For general cleaning procedures, see General Maintenance Instructions, page 2-3.
Coil assembly (4)
Using ohmmeter, check coil resistance.
Resistance should be 7.5 ohms ± 0.5
ohms.
2-304
|
|