TM 5-2815-241-34&P
FINAL TESTING AND ADJUSTMENTS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
I.
Check all filters, gaskets, connections,
and hoses for leaks.
m. Shut down engine.
Check for leaks and repair as
necessary.
n.
Using appropriate tools, tighten all
exposed capscrews.
NOTE
Valve and injector readjustment, after one hour of operation, is necessary to ensure
lowest smoke potential and to avoid excessive injector train loads.
o.
Restart engine (page 2-3) and run for
one hour at 1200 RPM.
p. Shut down engine.
q.
Check valve and injector adjustments.
Adjust valves to hot specifications:
0.008 Inch (0.20 mm) clearance for
intake valves, 0.023 Inch (0.58 mm)
clearance for exhaust valves, and
0.170 Inch (4.32 mm) for Injector
plunger travel. See valve and Injector
adjustment, page 2-106.
T A 2 4 2 6 1 6
2-421
|
|