Custom Search
 
  
 
TM   5-2815-241-34&P FLYWHEEL  HOUSING  REMOVAL INITIAL  SETUP Tools Personnel   Required Extension,   6-inch,   1/2-inch   drive Handle,   ratchet,   1/2-inch   drive Pliers,  diagonal-cutting,  8-inch Socket,   7/8-inch,   1/2-inch   drive Socket,   15/16-inch,   1/2-inch   drive Two Equipment   Condition Oil  pan  removed  (page  2-44). Materials/Parts Gasket,  flywheel  housing ACTION LOCATION ITEM REMARKS 1. Flywheel housing (1) Lockwire  (2),  six screws  (3)  and flex  plate  (4) a. Using  8-inch  diagonal-cutting  pliers, cut   lockwire. b. Using   1/2-inch   drive   7/8-inch   socket, 6-inch  extension,  and  ratchet  handle, unscrew and take off. 2. Nine  screws  (5)  and nine   lockwashers   (6) Using   1/2-inch   drive   15/16-inch   socket, 6-inch  extension,  and  ratchet  handle, unscrew and take out. Discard lockwashers. WARNING Due to excessive weight, assistance will be needed to prevent personnel injury when lifting heavy parts. 3. Cylinder block (7) Flywheel   housing   (1) and  flywheel  housing gasket  (8) a. b. With  assistance,  take  off  flywheel housing. Take  out  flywheel  housing  gasket, Discard    gasket. TASK ENDS HERE TA   242367 2-46


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business