TM 5-2815-241-34&P
CRANKSHAFT INSTALLATION
INITIAL SETUP
Tools
Bar, pry
Hammer, ball-peen, 16-ounce
Handle, hinged, 3/4-inch drive
Handle, ratchet, 3/4-inch drive
Indicator, dial
Mandrel, seal
Punch, driftpin, 1/8-inch
Socket, 9/16-inch, 1/2-inch drive
Socket, 1 1/2-inch, 3/4-inch drive
Wrench, torque, 0 to 250 ft lb (0 to
350 N-m), 1/2-inch drive
Wrench, torque, 100 to 600 ft lb
(140 to 840 N-m), 3/4-inch drive
Materials/Parts
Cloth, crocus (item 4, appendix B)
Crankshaft and bearing kit
Dowel, ring (seven required)
Gasket, rear cover
Gear oil (item 9, appendix B)
Lock plates (14 required)
Lockwashers (eight required)
Oil, lubricating (item 12, appendix B)
Seal, rear cover
Washer, thrust (four required)
Equipment Condition
Cylinder block mounted on engine repair stand
(page 2-11).
ACTION
LOCATION
ITEM
REMARKS
1. Cylinder block (1)
Fourteen screws (2)
and seven main
bearing caps (3)
Using 3/4-inch drive 1 1/2-inch socket and
hinged handle, unscrew and take off.
CAUTION
Do not touch wear surface of main bearings and thrust rings with hands. Acid from hands
can cause premature bearing failure.
NOTE
Before performing steps 2 thru 5, coat upper main bearings, ring dowels, upper thrust
rings, and crankshaft main journals with lubricating oil.
2.
New upper main bear-
Put in and aline with oilhole and ring dowel
ing number seven (4)
hole in cylinder block.
3.
Six new upper main
bearings (5) and
seven new ring
dowels (6)
a.
Aline oilholes in upper main bearings
with oilholes in cylinder block, and put
in.
b.
Put ring dowels in holes in cylinder
block.
2-54
|
|