Custom Search
 
  
 
TM 55-4920-436-13&P
CHAPTER 3 MAINTENANCE INSTRUCTIONS, AVIM
SECTION I. REPAIR PARTS, SPECIAL TOOLS, TILDE, AND SUPPORT EQUIPMENT
3-1. Common tools and equipment. For authorized common tools and equipment, refer to the Modified Table of
Organization and Equipment (MTOE) applicable to the AVIM unit.
3-2. Torque values. All equipment or tools secured to the floor or walls of the shelter must be carefully tightened to
specific torque limits. These torque limits are contained in Appendix F of this manual.
3-3. Special tools. TILDE, and support equipment. No special tools required.
3-4. Repair parse. Repair parts, hardware and bulk stock are listed in Appendix C of this manual.
SECTION II. SERVICE UPON RECEIPT
3-5. Checking equipment.
a. Once shelter has been erected, inventory for completeness of shop equipment.
b. Inspect equipment to ensure that all items are still firmly secured to floor and wall mounts. In the event an item
has broken loose and been damaged or has caused damage to other equipment of the shelter a DD Form 6, Packaging,
Improvement Report will be submitted.
c. After equipment has been positioned to the recommended operational floor plan check all items requiring service.
Preventive maintenance (PM) and preoperational services will be performed IAW applicable equipment TMs.
3-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business