Tweet |
Custom Search
|
|
|
||
TM 55-4920-436-13&P
3-13. Fixtures - Water Feed Thru Connector - Inspect
3-13
This task covers:
Inspection of connector
INITIAL SETUP
Personnel Required:
68B Aircraft Powerplant Repairer
INSPECTION
1. Check condition of threads on both ends of water feed
thru connector (1).
2. See that dust caps (2) are available and used as
required.
3. Ensure that weld (3) on connector (1) is not cracked or
broken. If defective, see TASK 3-14.
END OF TASK
3-15
|
||