1
2
3
4
5
6
4-22.
DISASSEMBLE LEFT END COVER ASSEMBLY
(SHEET 2 OF 4)
Using chisel and hammer,
washer ( 1); bend tab away
straighten bent tab of
from bolt (2).
Using 9/1 6 inch socket, install two 1 /2-20 x 3 inch
bolts (3) in tapped holes at either end of output flange
(4).
Using one hand, hold pry bar between two bolts (3) to
prevent flange (4) from turning.
Using 3/4 inch socket with other hand, remove bolt (2)
and washer (1) from output flange (4).
Remove output flange (4) from right end cover
assembly (5).
Using 9/1 6 inch socket, remove two bolts (3) from
output flange (4).
FOLLOW-ON PROCEDURE: Install output flange.
Refer to paragraph 4-24.
End of Task 1
TASK 2. REMOVE LH OUTPUT SHAFT AND SEAL
COMMON TOOLS:
Drift, brass
Hammer, hand, ball peen
Press, arbor, hand operated
Punch drive pin, straight
Screwdriver, flat tip (2 required)
SUPPLIES:
Rag, wiping (Item 15, Appendix C)
Wooden Block, 2 x 4 inches x 16 inches long (2 required)
(Item 2, Appendix C)
PRELIMINARY PROCEDURE: Left end cover is
removed. Refer to paragraph 4-8.
PERSONNEL REQUIRED: TWO
One soldier hold end cover on edge for removal of
output shaft.
One soldier use hammer and punch to drive shaft
from end cover.
Go to Sheet 3
Para. 4-22, Task 2
TM 9-2520-272-34&P
4-149
|
|