TM 9-2520-272-34&P
4-6. INSTALL TRANSMISSION ON MAINTENANCE STAND
(SHEET 2 OF 7)
TASK 2. INSTALL TRANSMISSION ON ADAPTER PLATE
COMMON TOOLS:
Extension, socket wrench 1/2 inch square drive, 6 inch
Handle, socket wrench, 1/2 inch square drive
Hoist, 1 ton (2 required)
Punch, aligning, 3/8 inch dia. point
Socket, socket wrench, 1/2 inch square drive, 9/16 inch
Socket, socket wrench, 1/2 inch square drive, 3/4 inch
Wrench combination, 9/16 inch
Wrench torque, 0-175 ft-lb
SPECIAL TOOLS:
Lifting Sling, three-leg (19207) 12268036
Lifting Sling, two-leg (19207) 12268037
Adapter Plate Kit (73342) 11650180
Bolt, 1/2-32 x 2 inches (96906) MS35764-271 (3 required)
Washer, 1/2 inch (96906) MS27183-18 (3 required)
SUPPLIES:
Bolt, 3/8-16 x 1-3/4 inches (3 required)
Washer, flat, 3/8 inch (6 required)
Rag, wiping (Item 15, Appendix C)
PRELIMINARY PROCEDURE: Transmission removed from shipping container. Refer to
paragraph 4-4.
PERSONNEL REQUIRED: TW O
Go to
4-14
One soldier to operate each hoist when rotating transmission from vertical to horizontal
position
One soldier to operate hoist, other soldier to bolt transmission to adapter plate when
installing transmission on maintenance stand.
Check slings and lifting devices for cuts, breaks, or wear before and during
hoisting. Slings and lifting devices can break and cause injury or death.
Transmission will tilt suddenly when weight shifts from one sling to the other.
Stay clear of slings and transmission to avoid injury.
Transmission weighs about 910 pounds. To avoid injury or death; keep out
from under and clear of transmission at all times. Do not let transmission
swing freely during hoisting.
Sheet 3
Para. 4-6, Task 2
W A R N I NG
|
|