Custom Search
 
  
 
ARMY TM 9-2805-256-14 AIR FORCE TO 38G2-102-2 NAVY NAVFAC P-8-611-14E 5-9. Ignition Timing (Breaker Point Ignition). This  task  covers: Adjustment INITIAL  SETUP Tools Equipment   Condition General Mechanic’s Tool Kit (Item 1, Appendix B) Breaker point gap set (para. 4-30). Rocker  cover  removed  (para.  4-25). Adjustment (figure 5-6) (1) (2) (3) (4) (5) (6) Unsnap two clips (1) and move breaker point cover (2) out of way. Loosen screw (3) and move ignition timing hole cover  (4) to  expose  timing  hole. Rotate  flywheel  clockwise  until  exhaust  valve  (5)  closes,  and  stop  when  ignition  timing  mark  on  the flywheel  alines  with  pointer. At this point the breaker points contacts (6) should just be starting to open. If they are not loosen screw (7) and turn ignition cam (8) counterclockwise until contacts (6) just start to open and tighten screw (7). Close ignition timing hole cover (4) and tighten screw (3). Install breaker points cover (2) and secure with two clips (1). 5-16


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business