Custom Search
 
  
 
ARMY   TM   9-2805-256-14 AIR   FORCE   TO   38G2-102-2 NAVY   NAVFAC   P-8-611-14E 4 - 3 2 .   B r e a t h e r     L i n e. This   task   covers: a.   Removal   (oil   bath) d.   Removal   (dry) b.   Inspection   (oil   bath) e.    Inspection    (dry) c.   Installation   (oil   bath) f.   Installation   (dry) INITIAL    SETUP Tools Materials/Parts General   Mechanic’s   Tool   Kit   (Item   1,   Appendix   B) Rags,   Wiping   (Item   6,   Appendix   D) Solvent,    Drycleaning    (Item    7,    Appendix    D) Sleeve,    Rubber    (NSN    5365-00-215-7421) a. Removal.   Oil   Bath. (figure    4-23) (1)   Loosen   coupling   nut   (1)   from   rocker   cover   (2). (2)   Loosen   coupling   nut   (3)   from   air   cleaner   (4)   and   remove   breather   line   (5). b.  I n s p e c t i o n . W A R N I N G Drycleaning   solvent   PD-680   used   to   clean   parts   is   potentially   dangerous   to   personnel   and property.   Avoid   repeated   and   prolonged   skin   contact.   Do   not   use   near   open   flame   or excessive   heat.   Flash   point   of   solvent   is   100°F-138°F   (38°C-60°C). (1)   Clean   breather   line   with   drycleaning   solvent. (2)   Ensure   there   are   no   obstructions   in   line. (3)   Inspect   coupling   nuts   for   signs   of   striped   threads   or   other   damage,   and   replace   breather   line   if   damage   is found. c.    Installation.    Oil    Bath.   (figure   4-23) (1)   Position   breather   line   (5)   on   rocker   cover   (2)   and   finger   tighten   coupling   nut   (1). (2)   Position   breather   line   (5)   on   air   cleaner   (4),   tighten   coupling   nut   (3),   and   finish   tightening   coupling nut   (1). 4 - 50


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business