Custom Search
 
  
 
ARMY TM 9-2805-257-14 AIR FORCE TO 38G2-103-2 NAVY NAVFAC P-8-612-14E c. Installation.  Oil  Bath.  (figure  4-24) (1) Install coupling nut (5) and rubber sleeve (8) on breather line (7). (2) Install breather line (7) and finger tighten coupling nuts (1), (3), and (5). (3) Tighten coupling nuts (1), (3), and (5). Figure 4-24. Breather Line (Oil Bath), Removal and Installation. 4-55


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business