ARMY TM 9-2805-257-14
AIR FORCE TO 38G2-103-2
NAVY NAVFAC P-8-612-14E
c. Installation. Oil Bath. (figure 4-24)
(1) Install coupling nut (5) and rubber sleeve (8) on breather line (7).
(2) Install breather line (7) and finger tighten coupling nuts (1), (3), and (5).
(3) Tighten coupling nuts (1), (3), and (5).
Figure 4-24. Breather Line (Oil Bath), Removal and Installation.
4-55
|
|