Custom Search
 
  
 
ARMY   TM   9-2805-258-14 AIR   FORCE   TO   38G2-89-21 NAVY   NAVFAC   P-8-614-14E 4-37.   High   Tension   Cables. This   task   covers: a .    R e m o v al b.   Test c.    Installation INITIAL   SETUP Tools Equipment   Condition General   Mechanic’s   Tool   Kit   (Item   1,   Appendix   B) Top   cover   removed   (para.   4-21). Multimeter    (NSN    6625-01-139-2512) (Item   2,   Appendix   B) N O T E The   removal   and   installation   procedures   are   the   same   for   both   high   tension   cables. a.     (figure   4-31) (1)   Loosen   connector   nut   (1)   and   tag   and   remove   high   tension   cable   (2). (2)   Loosen   connector   nut   (3)   and   remove   high   tension   cable   (2). (3)   Remove   grommet   (4)   and   remove   high   tension   cable   (2)   from   left   hand   shroud   (5). b .   T e s t . (1) (2) (3) Perform   continuity   test   between   spring   ends   on   high   tension   cable.   If   continuity   is   not   present,   replace high    tension    cable. Perform   continuity   test   between   metal   ends   of   hign   tension   cable,   if   continuity   is   not   present,   replace hign    tension    cable. Perform   continuity   test   between   metal   end   of   hign   tension   cable   and   spring   end.   If   continuity   is   present, replace   high   tension   cable. c. Installaiton.   (figure   4-31) (1)   Install   grommet   (4)   on   high   tension   cable   (2)   and   install   in   left   hand   shroud   (5). (2)   Install   high   tension   cable   (2)   and   tighten   connector   nut   (3). (3)   Install   high   tension   cable   (2)   as   tagged   and   tighten   connector   nut   (1). 4 - 68


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business