Custom Search
 
  
 
ARMY TM 9-2805-258-14 AIR FORCE TO 38G2-21 NAVY NAVFAC P-8-614-14E 4-53. Wiring Harness. This task covers: a. Test b. Removal. c. Installation INITIAL SET UP Tools Equipment Condition General Mechanics Tool Kit (em 1, Appendix B) Top cover removed (para 4-21). Mutimeter (NSN 6625-01-139-2512) Air cleaner removed (para 4-15). (Item 2, Appendix B) a. Test.  (figure4-51) Perform end to end continuity test on wiring harness (1).  (Refer to figure 4-55). b. Removal.  (figure 4-51) (1) Tag and remove wiring harness led from starter solenoid (1), oil shutdown switch (2), oil pressure transmitter (3), magneto (4), regulator-rectifier connector (5) and alternator connector (6). (2) Remove harness (7) from dips (8). (3) Remove four screws (9) and remove wiring harness (7). c. Installation.  (figure 4-51) (1) Install wiring harness (7) and secure  with four screws (9). (2) Install wiring harness (7) in dips (8). (3) Install wiring harness leads and connectors as tagged. 4-108  Change 1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business