Custom Search
 
  
 
ARMY  TM  9-2805-262-14 AIR  FORCE  TO  38G2-90-1 NAVY  NAVFAC  P-8-613-14E 4-44.  Breaker   Point   Cover. This  task  covers: a. Removal (breaker point ignition) d.  Removal  (breakerless  ignition) b. Inspection (breaker point ignition) e.  installation  (breakerless  ignition) c.  Installation  (breaker  point  ignition) INITIAL  SETUP Tools Materials/Parts General Mechanic’s Tool Kit (Item 1, Appendix B) Gasket,  Breaker  Point  Cover  Mounting (P/N  13206E0434) a. Removal Breaker  point Ignition) . . . (figure 4-41) Unsnap two clips (1) and remove breaker point cover (2) and gasket (3). NOTE Some engines are equipped with grounding straps connected to cover. Tag and remove grounding  strap  as  needed. b . Inspection (Breaker Point Ignition).  (figure 4-:41) Inspect gasket (3) and replace if torn or otherwise damaged. c. Installation    (Breaker  Point  Ignition). (figure 4-41) NOTE Connect  grounding  strap  to  cover  as  tagged. Install breaker point cover (2) and gasket (3) and secure with two clips (1). 4-84


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business