Custom Search
 
  
 
ARMY  TM  9-2805-262-14 AIR  FORCE  TO  38G2-90-1 NAVY  NAVFAC  P-8-613-14E 4-49.  Breaker   Points   (cont). NOTE The removal and installation procedures are the same for both sets of breaker points. b. Removal. (figure 4-50) (1) Remove two screws (1) and washers (2) and remove connector bar (3). (2) Remove two screws (4) and washers (5) and remove breaker points (6). c. Inspection. (figure 4-50) Inspect breaker points (6) and replace if cam follower (7) is cracked or otherwise damaged, contacts (8) are burned or pitted, or cam wick (9) is missing. d. Installation (figure 4-50) NOTE Do not tighten right hand screw of lower breaker points or left hand screw of upper breaker points, fully at this point. Install breaker points (6) and secure with two screws (4) and washers (5) and adjust points. 4-102


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business