Tweet |
Custom Search
|
|
|
||
TM 9-2815-220-24
DUST EJECTOR SYSTEM REPLACEMENT
0083 00
DISASSEMBLY (Continued)
3. Remove insulators (26, 27) from ejector tube (1).
a. Remove eleven screws (28), flat washers (29), lock washers (30) and nuts (31) to remove
insulation halves (26, 27). Discard lock washers.
4. Remove hose connector (32) and clamps (2).
5. Remove hose connector (33) and clamps (7).
2
2 32
7
33
7
31
30
29
26
1
27
29
28
6. Remove elbow (34) from right bank ejector tube (11).
34
11
WP 0083 00-5
|
||