Tweet
Custom Search
Back
INSTALLATION (Continued)
Up
TM-9-2815-220-24 Maintenance Manual for AVDS-1790 2CA 2DA and 2DR Air-Cooled 12-Cylinder Diesel Engines
Next
TURBOSUPERCHARGER AND TRANSMISSION SHROUDS REPLACEMENT (2CA & 2DA)
TM
9-2815-220-24
SMOKE
GENERATION
SYSTEM
REPLACEMENT
0094 00
INSTALLATION
(Continued)
10.
Install
smoke
generator
fuel
line
(1).
a.
Install
smoke
generator
fuel
line
(1)
at
tee
fitting
(2)
on
the
bottom
of
the
secondary
fuel
filter
housing
(3).
3
1
2
3
END
OF WORK
PACKAGE
WP 0094
00-16
Privacy Statement
-
Copyright Information.
-
Contact Us