Tweet |
Custom Search
|
|
|
||
TM 9-2815-220-24
TURBOSUPERCHARGER AND TRANSMISSION
SHROUDS REPLACEMENT (2CA & 2DA)
0095 00
INSTALLATION (Continued)
4. Install transmission cooling air shroud (8).
a. Secure transmission cooling air shroud (8) using seven assembled washer bolts (11).
b. Secure turbosupercharger outer shroud (13) using screw (10) with one new
self-locking nut (9) (item 282, WP 0175).
13
9, 10
8
11 (seven places)
WP 0095 00-9
|
||