|
|
|
TM 9-2815-237-34
2-21. CYLINDER HEAD AND VALVE REPAIR (Contd)
10. Apply pipe sealing compound to cold start advance switch (1) and install in right cylinder head (2).
11. Install water jacket cover gasket (5) and water jacket cover (4) on right cylinder head (2) and secure
with two capscrews (3). Tighten capscrews (3) to 25-37 lb-ft (3450 Nm).
12. Apply pipe sealing compound to engine temperature sending unit (6) and install in left cylinder
head (2).
13. Install four precombustion chambers (7) in cylinder head (2) flush to +0.002 in. (0.050 mm).
14. Repeat step 13 for opposite cylinder head.
2-70
|
|
|
|
Privacy Statement -
Copyright Information. -
Contact Us