Custom Search
 
  
 
ARMY TM 9-2815-255-24 AIR FORCE TO 38G1-95-2 MARINE CORPS TM 2815-24/4 3-19.2.  Installation. a. Install jam nut (4, FIGURE 333) on tube (3) exposing number of threads above nut as noted during removal. b. Screw tube (3) into engine block and tighten jam nut (4). c. If in doubt of level accuracy, perform following: NOTE Engine should be cold and new filter installed before filling. (1) Run engine to circulate oil, drain and fill engine with proper amount of new engine oil, refer to end item maintenance manual. (2) Loosen jam nut (4) and adjust tube until dipstick shows oil level at full mark.  Tighten jam nut (4). d.  Install new preformed packing (2) and dipstick (1). 3-20.  OIL PAN. 3-20.1.  Removal. a. Drain engine lubrication system, refer to end item maintenance manual. NOTE Eight   of   the   28   bolts   are   longer   than   the   other   bolts.      Note   their   location   for   use   during installation. b. Support  oil  pan  and  remove  eight  bolts  (1,  FIGURE  3-34),  twenty  bolts  (2),  and  twenty-eight  lockwashers  (3), securing oil pan (4) to engine block.  Remove oil pan (4) and gasket (5); discard gasket (5). c. Remove all traces of old gasket from oil pan and oil pan rail. 3-63


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business