Custom Search
 
  
 
TM  5-2815-241-34&P LUBRICATING  OIL  PUMP  INSTALLATION INITIAL   SETUP Tools Materials/Parts Extension,   6-inch,   1/2-inch   drive Handle,   ratchet,   1/2-inch   drive Indicator,  dial Socket,   5/8-inch,   1/2-inch   drive Wrench,  torque,  0  to  250  ft  lb (0  to  350  N•m),  1/2-inch  drive Gasket Lockwasher   (five   required) Equipment   Condition Air  compressor  and  fuel  pump  installed (page  2-86). ACTION LOCATION ITEM REMARKS 1. Oil pump (1) New  gasket  (2) Put  on. NOTE When performing step 2, aline gear teeth on oil pump to mesh with gear teeth on camshaft. 2. Cylinder block (3) Oil  pump  (1) Put  in. 3. Oil pump (1) Five  screws  (4) and  five  new lockwashers   (5) Using   1/2-inch   drive   5/8-inch   socket, 6-inch  extension,  and  ratchet  handle, screw  in  until  snug. 4. Five  screws  (4) Using   1/2-inch   drive   5/8-inch   socket, 6-inch  extension,  and  0  to  250  ft  lb  (0  to  350 N•m) torque wrench, tighten to 40 to 46 ft lb (56 to 63 N•m). NOTE Method  used  for  mounting  dial  indicator  is  at  discretion  of  using  facility.  Set  contact point of dial indicator on oil pump gear teeth. 2-88


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business