Custom Search
 
  
 
TM   5-2815-241-34&P CAM   FOLLOWER   ASSEMBLY   -   CONTINUED 17.  Cam  follower Cam  follower lever (3) bushing   (4) ACTION LOCATION ITEM REMARKS NOTE Steps  17  to  19  are  typical  for  all  cam  follower  levers. a. Place on cam follower lever, alining oil  hole  (5)  with  oil  hole  (6). b. Using  arbor  press  and  ST-970  plug  driv- ing mandrel, press in. c. Using   60-degree   angle   cutter   and   suit- able drill press, chamfer each end of cam  follower  bushing. d. Using  0-  to  1-inch  bushing  hone,  hone cam follower bushing to 0.7495 to 0.7505  inch  (19.037  to  19.063  mm). Clean  with  drycleaning  solvent,  after honing,  to  remove  all  grit. Use  ST-195  plug  gage  to  check  bore diameter. NOTE If new cam follower sockets are installed in cam follower levers, new push rods must be used when engine is reassembled. 18. Cam  follower socket  (7) a. Place  in  position  in  cam  follower lever  (3). b. Using  arbor  press  and  ST-249  mandrel and  block,  press  in. 2-261


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business