TM 5-2815-241-34&P
CAM FOLLOWER ASSEMBLY - CONTINUED
17. Cam follower
Cam follower
lever (3)
bushing (4)
ACTION
LOCATION
ITEM
REMARKS
NOTE
Steps 17 to 19 are typical for all cam follower levers.
a.
Place on cam follower lever, alining
oil hole (5) with oil hole (6).
b.
Using arbor press and ST-970 plug driv-
ing mandrel, press in.
c.
Using 60-degree angle cutter and suit-
able drill press, chamfer each end of
cam follower bushing.
d.
Using 0- to 1-inch bushing hone, hone
cam follower bushing to 0.7495 to
0.7505 inch (19.037 to 19.063 mm).
Clean with drycleaning solvent, after
honing, to remove all grit.
Use ST-195 plug gage to check bore
diameter.
NOTE
If new cam follower sockets are installed in cam follower levers, new push rods must be
used when engine is reassembled.
18.
Cam follower
socket (7)
a.
Place in position in cam follower
lever (3).
b.
Using arbor press and ST-249 mandrel
and block, press in.
2-261
|
|