Custom Search
 
  
 
TM    5-2815-241-34&P ANEROID  CONTROL  VALVE  REMOVAL INITIAL  SETUP Tools Equipment   Condition Extension,   6-inch,   1/2-inch   drive Handle,   ratchet,   1/2-inch   drive Socket,   9/16-inch,   1/2-inch   drive Wrench,   open-end,   9/16-inch Wrench,   open-end,   5/8-inch Wrench,   open-end,   7/8-inch Engine  removed  from  engine  transport  stand and mounted on engine repair stand. (Engine repair  stand  and  mounting  instructions  will  be  at discretion  of  repair  facility.) ACTION LOCATION ITEM REMARKS 1. Intake manifold (1) Vacuum  line  nut  (2) Using   9/16-inch   open-end   wrench,   loosen and  disconnect. 2.  Aneroid  control valve (3) Fuel  line  nuts  (4) Using   5/8-inch   and   7/8-inch   open-end wrenches,  loosen  and  disconnect. 3. Fuel  line  nuts  (5) Using   5/8-inch   and   9/16-inch   open-end wrenches,  loosen  and  disconnect. 4. Intake manifold (1) Two  screws  (6),  two lockwashers   (7),   two spacers  (8),  aneroid control valve (3) and  bracket  (9) a. Using   1/2-inch   drive   9/16-inch   socket, 6-inch  extension,  and  ratchet  handle, unscrew and take out. b. Take off aneroid control valve with bracket. Discard    lockwashers. TA   242348 2-25


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business