TM 55-4920-436-13&P
d. Counterbalance Cable Removal.
1. After shop erection is complete (AND
COUNTERBALANCE
CABLES
ARE SECURED),
remove three screws (1) from cable retainer block (2).
2. Let cable (3) and retainer block (2) hang loose
next to shelter (4).
3. Reinstall retainer block screws (1) and secure.
e. Shop is now ready for reconfiguration of equipment to operational mode.
NOTE
All equipment or tools secured to the floor or walls of the shelter must be carefully tightened
to specific torque limits. See Appendix F.
SECTION II. PREPARING SHOP FOR OPERATION
2-2. ECU Shelves, lowering procedures.
NOTE
The following procedures apply
only if the ECUs are to be installed.
a. Remove four plugs (1) on outside of each shelf
(2).
NOTE
(For shelter P/N 136-0000-101) One
ECU opening is located in the fold-
out end wall and one ECU opening
is located in the fold-out side wall.
(For shelter P/N 5-4-2828-1) Both
ECU openings are located in the
fold-out end walls.
One ECU
opening in each fold-out end wall.
Change 1
2-3
|
||