5. (For shelter P/N 5-4-2828-1) close slide stops (1) against counterbalance cables (2) on both cable reels (3).
6. Securing the counterbalance cables will allow removal of the counterbalance cables attached to each end of fold-
out floor.
7. Continue with remaining procedures outlined in TM 10-5411-201-14 for final erection of the shelter.
Change 1