Custom Search
 
  
 
TM 55-4920-436-13&P
SECTION II. MAINTENANCE ALLOCATION CHART
FOR ENGINE SHOP
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE
CATEGORY
GROUP
COMPONENT/
MAINTENANCE
TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
AVUM
AVIM
DEPOT
EQUIPMENT
REMARKS
01
Insert Fasten-
INSPECT
.2
101
A, B & C
ers and Bolts
REPLACE
1.5
102
D
02
Fixtures
0201
Fire Ex-
REMOVE
.1
tinguisher
INSTALL
.1
020101
Fire Ex-
INSPECT
.1
101
A
tinguisher
Mounting
0202
Water/Oil Sepa-
INSPECT
.1
101
B
rator Mounting
020201
Water/Oil Sepa-
INSPECT
.1
102
rator Air Hose
REPLACE
1.0
102
and Fittings
0203
Water Feed
INSPECT
.2
Thru Connector
REPLACE
1.0
102
03
Electrical
0301
Ground Rod/ Strap
INSPECT
.2
104
E
04
Special Brackets
and Fabricated
Components
0401
Book Rack
INSPECT
.1
101
Mounting
REPAIR
1.0
102 &
103
REPLACE
.5
101 &
102
0402
Tool Box
INSPECT
.6
101
Mounting (12 &
REPAIR
3.0
102 &
15 unit)
103
REPLACE
1.0
101 &
102
B-3


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business