Custom Search
 
  
 
PAR 100-103 MAIN-PRESSURE  REGULATOR  AND CHAP 5, SEC  VIII LOCKUP SHIFT VALVE ASSEMBLY–REBUILD 100.   INSPECTION   AND   REPAIR Refer   to   par.   72   for   general   inspec- tion  and  repair  recommendations.  Repair and   rebuild   points   of   measurements   for fits, clearances   and   wear   limits   are indicated   by   small,   lower   case   letter   in fig.   373,   fold-out   2.   Refer   to   par.   236   for wear  limits  information. 101.   ASSEMBLY   (fig.   373,   fold-out   2) .   Install   new   replacement   inserts 137,  140,  112,  113  and  122  from  0.005-inch to  one  turn  below  the  housing  surface. b.   If   1-inch   plug   114   was   removed, install   it.   Torque   plug   114   to   70-90   pound- feet.  If  1/8-inch  plug(s)  115,  116  or  131 were   removed,   install   them.   Torque   plugs 115,  116  and  131  to  50-60  pound-inches.  If l/4-inch   plug(s)   117   or   123   were   re- moved,   install   them.   Torque   plugs   117   and 123   to   96-120   pound-inches.   If   1/16-   inch plug  9  was  removed,  install  it.  Torque plug  9  to  35-50  pound-inches. c.  Install  sleeves  119,  120,  134  and 136,   pressing   them   until   they   are   firmly seated   against   the   housing. d.   If   input   transfer   drive   gear   bearing support   sleeve   139   was   removed,   install new  replacement  as  follows: (1)   Mark   the   locations   of   the three  original  pin  holes,  in  the  sleeve  bore, on  the  bolt  hole  circle  of  the  housing. (2)  The  pin  holes  to  be  drilled  for the   new   sleeve   should   be   located   60 degrees clockwise   or   counterclockwise from   the   original   pin   holes.   The   two alternate   pin   locations   are   indicated   by the  broken  line  in  fig.  151. Note.  Be  sure  that  the  pin  holes to  be  drilled  do  not  interfere  with the  oil  holes  located  on  the  knit hole  circle  (fig.  151). (3)   Install   sleeve   139   (fig.   373, fold-out  2),  pressing  it  flush  with  the  hous- ing   outer   surface. (4)   Using   a   0.1855-0.1875   drill, drill  a  hole  0.410  to  0.470-inch  deep  at  one of   the   alternate   locations   chosen.   This hole   should   be   0.250-inch   inward   from   the cover  mounting  surface  and  at  a  30  degree angle   to   the   cover   mounting   surface.   Ref- er  to  figure  151. (5)   Drill   the   remaining   two   dowel pin  holes,  spacing  them  120  degrees  apart. (6)   Install   the   three   pins   (fig. 151),  driving  them  0.005  to  0.015-inch  be- low  the  sleeve  surface. (7)  Line  bore  sleeve  139  (fig.  373, fold-out   2)   to   7.0864-7.0876   inches   diam- eter,  with  a  finish  of  100  RMS  (fig.  151). .  Install   the   power   take-off   cover (fig.   150)   and   gasket.   Secure   the   cover with   ten   3/8-24   x   1-1/4   bolts   and   lock washers.  Torque  the  bolts  to  33-40  pound- feet. Section VIII. MAIN-PRESSURE REGULATOR AND LOCKUP SHIFT VALVE ASSEMBLY–REBUILD 102.   DESCRIPTION c.  Remove  seal  ring  8  from  plug  7. Refer   to   par.   22   for   the   description   of .   Using   a   l/2-inch   socket   wrench, the   main-pressure   regulator   and   lockup remove   six   bolts   29   and   lock   washers   28 shift   valve   assembly. retaining   valve   cover   assembly   23. 103.   DISASSEMBLY   (fig.   383,   fold-out   12) e.   Remove   cover   assembly   23   and gasket   22.   Remove   plug   19   from   cover .  Remove  retaining  ring  6  that  re- assembly   23. tains  valve  retainer  plug  7. f.   Remove   lockup   shift   valve   spring b.  Remove   plug   7,   valve   9   and   spring 27  and  valve  26. 1 0 .  Change  2  111


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business