Custom Search
 
  
 
4-18. INSTALL   TRANSMISSION   TOP   COMPONENTS (SHEET  14  OF  16) 10   Arrange   wiring   harness   (10)   and   connector   wires   (1,   4) so   that   all   wiring   is   tucked   neatly   under   or   between solenoids   (11). FOLLOW-ON   PROCEDURES:   Install   transmission   top cover   assembly.   Refer   to   this   paragraph,   TASK   8. End  of  Task  7 TM   9-2520-272-34&P TASK  8.  INSTALL  TRANSMISSION  TOP  COVER  ASSEMBLY,  BREATHER  AND LIFTING  BRACKETS         COMMON   TOOLS: Extension,   socket   wrench,   1/2   inch   square   drive,   6   inch Handle,   socket   wrench,   1/2   inch   square   drive Socket,   socket   wrench,   1/2   inch   square   drive,   1/2   inch Socket,   socket   wrench,   1/2   inch   square   drive,   9/16   inch Socket,   socket   wrench,   1/2   inch   square   drive,   5/8   inch Socket,   socket   wrench,   1/2   inch   square   drive,   3/4   inch Wrench,   torque,   0-175   ft-lb REPAIR   PARTS: Gasket   (transmission   top   cover)   (73342)   23045129 SUPPLIES: Bolt,   3/8-16   x   1-1/2   inch   (4   required) Cloth,   batiste,   lint-free   (Item   6,   Appendix   C) PRELIMINARY    PROCEDURE: Control   valve   assemblies   are   installed.   Refer   to   this   paragraph,   TASKS   3,   4,   5   and   6. Wiring   harness   assembly   is   installed.   Refer   to   this   paragraph,   TASK   2   and   7. Go  to  Sheet  15 Para.   4-18,   Task   8 4-93


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business