Custom Search
 
  
 
TM   9-2520-272-34&P 4-18. INSTALL   TRANSMISSION   TOP   COMPONENTS (SHEET  13  OF  16) Look   for   letters   A,   B,   C,   D,   E,   F   and   G   stamped   on wiring   harness   connectors   (1). Locate  solenoids  A,  B,  E,  F  and  G  on  main  control valve   assembly   (2)   and   locate   solenoids   C   and   D   on lockup   control   valve   assembly   (3). Match   wiring   harness   connectors   (1)   with   solenoid connectors   (4). Hold   harness   connector   (1)   and   solenoid   connector   (4) with   ends   of   connectors   facing   each   other. Rotate   connectors   (1,   4)   so   that   connector   loops   (s) will   fit   over   bayonets   (6). push   connectors   (1,4)   together   until   ends   of   connector loops   (5)   are   down   behind   ends   of   bayonets   (6) 1 2 3 4 5 6 7   Install   5/16-18   x   2-3/4   inch   bolt   (7)   through   washer   (8)   and   through   eye   of   harness   ground connector   (9). 8   using   socket,   install   bolt   (7)   through   main   control   valve   assembly   (2). 9   Using   torque   wrench,   tighten   bolt   (7)   to   17-20   lb-ft   (23-27   N•n). Go   to   Sheet   14 Para.  4-18,  Task  7 4-92


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business