Custom Search
 
  
 
TM   9-2520-272-34&P 4-5.   REMOVE   TRANSMISSION   TOP   COMPONENTS (SHEET  6  OF  8) TASK   5.   REMOVE   PRIORITY   VALVE   ASSEMBLY COMMON    TOOLS: Extension,   socket   wrench,   1/2   inch   square   drive,   6   inch Handle,   socket   wrench,   1/2   inch   square   drive Socket,   socket   wrench   1/2   inch   square   drive,   7/16   inch NOTE Transmission   top   cover   is   removed. Wiring   harness   does   not   have   to   be   removed   to   remove   control valve   assemblies 1   Using   socket,   remove   three   bolts   (1)   and   washers   (2) from   priority   valve   assembly   (3). 2   Remove   priority   valve   assembly   (3). FOLLOW-ON   PROCEDURE:   Install   priority   valve   assembly   Refer   to   paragraph   4-18. End  of  Task  5 TASK   6.   REMOVE   G2   BACKUP   VALVE   ASSEMBLY COMMON   TOOLS: Extension,   socket   wrench   1/2   inch   square   drive,   6   inch Handle,   socket   wrench,   1/2   inch   square   drive Socket,   socket   wrench   1/2   inch   square   drive,   7/16   inch 1    U s i ng NOTE Transmission   top   cover   is   removed. Wiring   harness   does   not   have   to   be removed   to   remove   control valve   assemblies. socket,   remove   four   bolts   (1)   and   washers   (2) from   G2   backup   valve   assembly   (3). 2   Remove   G2   backup   valve   assembly   (3). FOLLOW-ON   PROCEDURE:   Install   G2   backup   valve   assembly.   Refer   to   paragraph   4-18. End  of  Task  6 Go   to   Sheet   7 4-10 Para.  4-5,  Task  5


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business