TM 9-2520-272-34&P
4-5. REMOVE TRANSMISSION TOP COMPONENTS
(SHEET 6 OF 8)
TASK 5. REMOVE PRIORITY VALVE ASSEMBLY
COMMON TOOLS:
Extension, socket wrench, 1/2 inch square drive, 6 inch
Handle, socket wrench, 1/2 inch square drive
Socket, socket wrench 1/2 inch square drive, 7/16 inch
NOTE
Transmission top cover is removed.
Wiring harness does not have to be removed to remove control
valve assemblies
1 Using socket, remove three bolts (1) and washers (2)
from priority valve assembly (3).
2 Remove priority valve assembly (3).
FOLLOW-ON PROCEDURE: Install priority valve assembly Refer to paragraph 4-18.
End of Task 5
TASK 6. REMOVE G2 BACKUP VALVE ASSEMBLY
COMMON TOOLS:
Extension, socket wrench 1/2 inch square drive, 6 inch
Handle, socket wrench, 1/2 inch square drive
Socket, socket wrench 1/2 inch square drive, 7/16 inch
1 U s i ng
NOTE
Transmission top cover is removed.
Wiring harness does not have to be
removed to remove control
valve assemblies.
socket, remove four bolts (1) and washers (2)
from G2 backup valve assembly (3).
2 Remove G2 backup valve assembly (3).
FOLLOW-ON PROCEDURE: Install G2 backup valve assembly. Refer to paragraph 4-18.
End of Task 6
Go to Sheet 7
4-10
Para. 4-5, Task 5
|
|