Custom Search
 
  
 
TM   9-2815-202-34 Section   Il.   GENERAL   ENGINE   MAINTENANCE 4-2.   TURBOCHARGER   REMOVAL/INSTALLATION This  task  covers: a.  Removal b. Cleaning/Inspection c.  Installation INITIAL   SETUP MODELS MANDATORY   REPLACEMENT   PARTS 7083-7395 4 Locking nuts (App F, Item 105) 1 Gasket (App F, Item 79) 3 Lockwashers (App F, Item 93) TOOLS  AND  SPECIAL  TOOLS 4 Lockwashers (App F, Item 95) General mechanics tool kit (App B, Item 96) Torque wrench (App B, Item 101) EQUIPMENT   CONDITION Para   Description 3-11 Turbocharger oil supply line removed a.   Removal (1) (2) (3) (4) Loosen four clamps (1) and two rubber  connectors  (2)  securing turbocharger  oil  drain  tube  (3). Remove tube, hoses, and clamps. Loosen four clamps (4) and two hose connectors  (5)  connecting  air  inlet tube (6) to turbocharger (7) and air inlet  housing  (8). Slide  hoses  (5)  and  clamps  (4)  onto air inlet tube (6) and remove tube. Remove hoses and clamps from tube. Remove four locking nuts (9) and four flat  washers  (10)  securing turbocharger  to  exhaust  tee  (11). Discard  locking  nuts. CAUTION Tape  all  openings  of  turbocharger  after removal  to  keep  foreign  particles  from entering and damaging turbocharger blades. (5) Remove turbocharger (7) and gasket (12). Discard gasket. 4 - 3


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business