TM 9-2815-202-34
Section Il. GENERAL ENGINE MAINTENANCE
4-2. TURBOCHARGER REMOVAL/INSTALLATION
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
INITIAL SETUP
MODELS
MANDATORY REPLACEMENT PARTS
7083-7395
4 Locking nuts (App F, Item 105)
1 Gasket (App F, Item 79)
3 Lockwashers (App F, Item 93)
TOOLS AND SPECIAL TOOLS
4 Lockwashers (App F, Item 95)
General mechanics tool kit (App B, Item 96)
Torque wrench (App B, Item 101)
EQUIPMENT CONDITION
Para Description
3-11 Turbocharger oil supply line removed
a. Removal
(1)
(2)
(3)
(4)
Loosen four clamps (1) and two
rubber connectors (2) securing
turbocharger oil drain tube (3).
Remove tube, hoses, and clamps.
Loosen four clamps (4) and two hose
connectors (5) connecting air inlet
tube (6) to turbocharger (7) and air
inlet housing (8).
Slide hoses (5) and clamps (4) onto
air inlet tube (6) and remove tube.
Remove hoses and clamps from tube.
Remove four locking nuts (9) and four
flat washers (10) securing
turbocharger to exhaust tee (11).
Discard locking nuts.
CAUTION
Tape all openings of turbocharger after
removal to keep foreign particles from
entering and damaging turbocharger
blades.
(5) Remove turbocharger (7) and gasket
(12). Discard gasket.
4 - 3
|
|