TM 9-2815-202-34
3-5.
PREPARATION OF ENGINE PRIOR TO REMOVAL OF ENGINE
ACCESSORIES AND INSTALLATION ON MAINTENANCE STAND
This task covers:
a. Preparation
b. Inspection
INITIAL SETUP
MODELS
EXPENDABLE/DURABLE SUPPLIES
All
Tape (App C, Item 27)
Cleaning solvent (App C, Item 10)
TOOLS AND SPECIAL TOOLS
General mechanics tool kit (App B, Item 96)
Three-legged sling (App B, Item 84)
Four-legged sling (App B, Item 82)
a. Preparation for Removal of Accessories
WARNING
Never crawl under equipment
when performing maintenance
unless equipment is securely
blocked. Keep clear of
equipment when it is being
raised or lowered. Do not
allow heavy components to
swing while suspended by
lifting device. Exercise
extreme caution when working
near a cable or chain under
tension. Equipment may drop
or shift and injury to personnel
may result.
l
l
(1)
NOTE
Use the three-legged sling to lift
engine models 7083-7395 and
7083-7398.
Use four-legged sling to lift engine
models 7083-7391, 7083-7396, and
7083-7399.
Lift engine assembly for cleaning, draining,
and installation on maintenance stand by
using multi-leg sling (1) attached to engine
lifting brackets (2). Use a hoist having a
minimum lifting capacity of 1.5 tons (1.36
metric tons).
Change 1
3 - 2 7
|
|