Tweet |
Custom Search
|
|
|
||
TM 9-2815-220-24
PTO COUPLING/FUEL PUMP DRIVE HOUSING REPAIR (2DR ONLY)
0111 00
INSTALLATION (Continued)
2. Install PTO drive coupling (4) (Continued).
d. Install holding bar/puller tool (3) (item 64, WP 0176).
(1) Position holding bar/puller tool (3) on PTO drive coupling (4) as shown.
(2) Secure with two 7/16-20 x 1-1/2 inch cap screws (5).
e. Install nut (6) with flat washer (7).
f. Secure holding bar/puller tool to prevent PTO coupling (4) from turning.
g. Torque-tighten self-locking nut (6) using torque wrench (item 128, WP 0176):
(1) For early spur gear shaft (3/4-16 inch threads), note the prevailing nut torque (before
nut bottoms against the flat washer), and add 190 foot-pounds (258 Nm) torque to
complete the torque tightening procedure.
(2) For late spur gear shaft (7/8-14 inch threads), torque-tighten to 280-290 foot-pounds
(380-393 Nm).
h. Remove holding bar/puller tool (3).
3. Connect oil inlet hose (1) at 45-degree elbow (2).
4. Install two fuel hose clamps (11) and secure with new self-locking nut (9) (item 140,
6
1
4
2
7
3
5
END OF WORK PACKAGE
WP 0111 00-11 (12 blank)
|
||