| Tweet | 
|   
    Custom Search
   | 
 | 
|   | ||
|  TM 9-2815-220-24 CRANKSHAFT REPLACE/REPAIR 0139 00 INSTALLATION (Continued) 12. Torque-tighten tie-rod (1) slotted nuts (4). a. With the aid of a helper holding slotted nuts (4) on the opposite side of crankcase, torque- tighten 14 slotted nuts (4) on tie-rods (1) to 53 foot pounds (72 Nm). b. Apply additional torque to align slotted nut with hole in tie-rod if required. c. Install 14 new cotter pins (3) (item 521, WP 0175) to secure slotted nuts (4). 4 3 1 END OF WORK PACKAGE WP 0139 00-23 (24 blank) | ||
|  | ||