|
|
|
TM 9-2815-225-34&P
3-55. FUEL INJECTOR TESTING; TEST NO. 3 (Contd)
LOCATION/ITEM
ACTION
REMARKS
e. Top-stop Injector
60.
Top-stop screw (53) and top-
Install on injector assembly (39).
Install with two threads of top-
stop locknut (54)
stop screw (53) protruding above
top-stop locknut (54). This is a ref-
erence point only.
61.
Injector assembly (39)
Install on setting fixture (55) and
Be certain that seat and cup
tighten.
of injector assembly (39) is cen-
tered over cup retainer (56).
62.
Cup retainer (56)
Adjust and tighten upward to
100-115 lb-in. (11.3-12.5 Nm).
63.
Plunger (40)
a. Bottom in cup seat (60) with
Set dial indicator at zero. Weight
fixture handle (57).
(61) should be 10.1875 in.
(258.76 mm) from centerline of
dowel (62).
b. Release slowly.
Observe travel required until
plunger (40) spring washer con-
tacts injector top-stop screw (53).
Bottom plunger again and adjust
stop (58) up or down as required
until travel equals 0.224 in. (5.690
mm) 0.0005 in. ( 0.0127 mm).
64.
Top-stop locknut (54)
Using torque wrench (59), tighten
Recheck travel after torquing.
to 55 lb-ft (75 Nm).
FOLLOW-ON TASK: Install injector assembly (para. 3-82).
3-382
|
|
|
|
Privacy Statement -
Copyright Information. -
Contact Us