TM 9-2815-225-34&P
3-87. AIR AFTERCOOLER INSTALLATION
THIS TASK COVERS:
Installation
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
All
TM 9-2320-273-20
TM 9-2320-283-20
SPECIAL TOOLS
None
TROUBLESHOOTING REFERENCES
Para. 2-8
TEST EQUIPMENT
None
EQUIPMENT CONDITION
Engine retarders installed (para. 3-86).
MATERIALS/PARTS
Lubricant, high-pressure (Appendix C, Item 15)
SPECIAL ENVIRONMENTAL CONDITIONS
Three gaskets (15434) 3008591
Work area clean and away from blowing dirt and
Two lockwashers (15434) S-604
dust.
(M915A1/Big Cam III only)
Three lockwashers (96906) MS122032
GENERAL SAFETY INSTRUCTIONS
(M915/Big Cam I only)
None
PERSONNEL REQUIRED
Automotive repairman MOS 63H
LOCATION/ITEM
ACTION
REMARKS
Installation
NOTE
Perform steps 2 and 5 for M915/Big Cam I.
Perform steps 3 and 6 for M915A1/Big Cam III.
1.
Three new gaskets (9)
Install on three cylinder heads (1).
Use a small amount of high-pressure
lubricant to hold gaskets (9)
in place.
2.
Three screws (5), new
Install on bottom hole of each
Thread in three to five turns.
lockwashers (4), and
cylinder head (1).
washers (3) (M915/Big
Cam I)
3.
Screw (8), two screws (5),
Install on bottom hole of each
Thread in three to five turns.
three new lockwashers (4),
cylinder head (1).
and washers (3) (M915A1/
Big Cam III)
3-656
|
|