TM 9-2815-225-34&P
3-87. AIR AFTERCOOLER INSTALLATION (Contd)
LOCATION/ITEM
ACTION
REMARKS
Installation (Contd)
4.
Air aftercooler (2) and
Install on three cylinder
three gaskets (9)
heads (1) with three screws (5) or
screw (8) (M915A1/Big Cam III)
and three washers (3) and new
lockwashers (4).
NOTE
Two middle holes in air aftercooler are used for mounting ether starting kit.
Refer to TM 9-2320-273-20 or TM 9-2320-283-20 to install ether starting kit.
Tighten screws from the center outwards. Tighten all screws (M915A1/Big Cam III) to
20-25 lb-ft (27-34 Nm).
5.
Three screws (5), new
Install on three outside holes in
Tighten, but do not torque, screws
lockwashers (4), and
air aftercooler (2), three
(5). Install two remaining screws
washers (3) (M915/Big
gaskets (9), and three outer
(5) once ether starting kit has
Cam I)
cylinder heads (1).
been installed. Refer to
TM 9-2320-283-20.
6.
Screw (8), two screws (5),
Install on four outside holes in
Tighten, but do not torque, screws
three new lockwashers (4),
air aftercooler (2), three
(5) and screw (8). Install two
and washers (3) (M915A1/
gaskets (9), and three cylinder
remaining screws (5) once ether
Big Cam III)
heads (1).
starting kit has been installed.
Refer to TM 9-2320-283-20.
FOLLOW-ON TASKS:
Install water crossover tube and connection (TM 9-2320-273-20 or TM 9-2320-283-20).
Remove engine from maintenance stand (para. 3-88).
3-658
|
|