Custom Search
 
  
 
TM 9-2815-237-34 Change 1        2-183 2-41.   ENGINE ASSEMBLY FROM SUBASSEMBLIES (Cont’d) 5. Tighten all studs (6) and (7) and capscrews (8) and (9) to 30 lb-ft (41 Nm), following torque sequence shown. NOTE Perform steps 6 through 9 for turbocharged engines. 6. Install gasket (17) and intake manifold (16) on cylinder head (18) with eight studs (15). 7. Beginning at center of intake manifold (16) and working toward ends, tighten studs (15) to 30 lb-ft (41 Nm). 8. Repeat steps 6 and 7 for opposite side. NOTE Install turbocharger before installing center intake manifold. 9. Install two gaskets (12) and center intake manifold (14) on intake manifolds (16) with six capscrews (13).  Tighten capscrews (13) to 17 lb-ft (23 Nm). 10. Secure fuel supply line (21) and hose (20) to stud (7) with clamp (19). TORQUE SEQUENCE TURBOCHARGED ENGINE


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business