TM 9-2815-237-34
Change 1 2-183
2-41. ENGINE ASSEMBLY FROM SUBASSEMBLIES (Contd)
5.
Tighten all studs (6) and (7) and capscrews (8) and (9) to 30 lb-ft (41 Nm), following torque
sequence shown.
NOTE
Perform steps 6 through 9 for turbocharged engines.
6.
Install gasket (17) and intake manifold (16) on cylinder head (18) with eight studs (15).
7.
Beginning at center of intake manifold (16) and working toward ends, tighten studs (15) to 30 lb-ft
(41 Nm).
8.
Repeat steps 6 and 7 for opposite side.
NOTE
Install turbocharger before installing center intake manifold.
9.
Install two gaskets (12) and center intake manifold (14) on intake manifolds (16) with six
capscrews (13). Tighten capscrews (13) to 17 lb-ft (23 Nm).
10.
Secure fuel supply line (21) and hose (20) to stud (7) with clamp (19).
TORQUE SEQUENCE
TURBOCHARGED ENGINE
|
|