Custom Search
 
  
 
2-13.1.   ENGINE REPLACEMENT IN SHIPPING/STORAGE CONTAINER (Cont’d) TM 9-2815-237-34 Change 1 2-7 NOTE Ensure gasket is seated properly. 8. Using alignment pins (15), position upper container (4) on gasket (11) and lower container (13). 9. Install upper container (4) on lower container (13) with twenty-six capscrews (16), washers (18), and nuts (19).


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business