Custom Search
 
  
 
TM 9--2815--247--34 INTAKE AND EXHAUST VALVE AND METERING PUMP TIMING -- CONTINUED 0015 00 Adjust -- Continued 27. Install lubrication fitting (29) on left bank using mechanical puller (23). Figure 10 23 29 28. Install a new retaining ring (27) into bevel gearshaft (28) on left bank. 29. When timing is correct, complete Test steps 20 through 23. Figure 10 28 27 FOLLOW--ON MAINTENANCE: Install valve adjusting access covers on cylinders 6R and 6L (WP 0026 00) Install fans, covers, and top deck (TM 9--2350--292--20) END OF TASK 0015 00--25/26 blank


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business