TM 9--2815--247--34
0021 00--5
ENGINE AND CONTAINER REPLACEMENT -- CONTINUED
0021 00
Installation
1. Secure engine mount brackets (16) to engine (21) using six screws (23), six lockwashers (25) and six nuts (24).
WARNING
2. Attach engine sling (18) to hoist and lifting eyes (20) and (19).
3. With a helper to guide the load, carefully lift engine (21) and lower into container half (22), aligning holes in mount-
ing brackets (16) and mounting flanges (17).
4. Remove engine sling (18) from engine (21) and hoist.
5. Secure engine mounting brackets (16) to mounting flanges (17) using four lockwashers (15) and four nuts (14).
Figure 67
19
18
21
20
24
25
23
14
15
16
17
22
|
|