Custom Search
 
  
 
TM 9--2815--247--34 INTAKE MANIFOLD REPAIR -- CONTINUED 0032 00 Assembly 1.   Install six intake manifold flanges (7), six new preformed packings (8), six spring washers (9), and six spacer rings (10) onto three intake manifold tubes (4), intake manifold tube (5), and two intake manifold tubes (6). NOTE For left bank, two intake manifold tubes (6) install at cylin- der positions 1L and 3L, three intake manifold tubes (4) at cylinder positions 2L, 4L and 6L, and intake manifold tube (5) at cylinder position 5L. For right bank, intake manifold tube (6) installs at cylinder 1R, three intake manifold tubes (4) at cylinder 2R, 4R and 5R, two intake manifold tubes (3) at cylinder 3R and 6R. Leave 20 screws securing tubes to the intake manifold loose until intake manifold and aftercooler  assembly is installed on engine. This will allow indexing of tubes when installing on the engine. 2.   Install six intake manifold tubes (4, 5 and 6) into intake manifold (3) and secure with 20 screws (1) and 20 new lockwashers (2). Figure 27 5 4 3 7 10 6 8 9 2 1 NOTE FOLLOW--ON MAINTENANCE: Install intake manifold and aftercooler assembly (WP 0031 00) END OF TASK 0032 00--3/4 blank


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business