TM 9--2815--247--34
0035 00--4
POWER TAKE--OFF HOUSING AND ASSOCIATED PARTS REPAIR --
CONTINUED
0035 00
Installation
1. Install new gasket (10) on power take--off housing (8).
2. Install power take--off housing (8) and two fuel line clamps (9) with eight new self--locking nuts (6) and eight flat
washers (7).
3. Apply lubricant to threads of screw (3).
4. Install power take--off coupling (5) with screw (3) and flat washer (4).
5. Torque screw (3) to 540--560 lb--ft (732--759 NSm).
6. Remove engine turning tool (1) from flywheel (2).
Figure 32
3
4
6
7
9
6
7
9
10
5
8
1
2
END OF TASK
|
|
|
|