Custom Search
 
  
 
TM 9--2815--247--34 0035 00--4 POWER TAKE--OFF HOUSING AND ASSOCIATED PARTS REPAIR -- CONTINUED 0035 00 Installation 1.   Install new gasket (10) on power take--off housing (8). 2.   Install power take--off housing (8) and two fuel line clamps (9) with eight new self--locking nuts (6) and eight flat washers (7). 3.   Apply lubricant to threads of screw (3). 4.   Install power take--off coupling (5) with screw (3) and flat washer (4). 5.   Torque screw (3) to 540--560 lb--ft (732--759 NSm). 6.   Remove engine turning tool (1) from flywheel (2). Figure 32 3 4 6 7 9 6 7 9 10 5 8 1 2 END OF TASK


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business