Custom Search
 
  
 
TM 9--2815--247--34 0015 00--1 INTAKE AND EXHAUST VALVE AND METERING PUMP TIMING 0015 00 THIS WORK PACKAGE COVERS: Test, Adjust INITIAL SETUP: Tools and Special Tools General mechanic’s tool kit (item 1, WP 0103 00) (item 19, WP 0103 00) Engine turning tool (flywheel end) (item 1, WP 0104 00) Thickness gauge blade (0.010) (item 3, WP 0103 00) Thickness gauge blade (0.100) (item 5, WP 0103 00) Torque wrench (item 50, WP 0103 00) Mechanical puller (item 31, WP 0103 00) Materials/Parts Gaskets (2) (item 7, WP 0102 00) Lubricant (item 12, WP 0100 00) Retaining rings (2) (item 123, WP 0102 00) Equipment Conditions Fans, covers, and top deck removed (TM 9--2350--292--20) Valve adjusting access covers removed on cylinders 6R and 6L (WP 0026 00) References TM 9--2350--292--20 Test NOTE It is possible for the valve timing to be correct and be 180° out of phase with the fuel metering pump. 1.   Remove six cap screws (1), six flat washers (2), access cover (3) and gasket (4) from right and left banks. Dis- card gaskets. Figure 10 1 2 3 4


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business